Featured Projects

null
UCPB

UCPB testimonial on Hi-Cool Engineering Corporation

UCPB is extremely pleased with the product recommendation and implementation services of Hi-Cool Engineering Corporation in November 2012 to modernize its 34-year-old centralized air-conditioning equipment, a system in operation since the UCPB Corporate Offices Building in Makati City was inaugurated in 1978.

Mr. Cesar A. Rubio, EVP & CFO of UCPB

null
PETRON MEGA PLAZA

Replacement of Obsolete Packaged Air-Conditioning Units

The above condition has prompted Petron Megaplaza Condominium Association to embark on a major undertaking of replacing the remaining 27 obsolete Packaged Air-Conditioning Units of the building on a 5-year contract agreement with Hi-Cool Engineering Corporation. The retrofitting works were completed in 31 weekends without disruption to the business operations of the building tenants. Out of the 40 old Mitsubishi reciprocating-type air-conditioning units in the building, 37 units were replaced using Hitachi
PACU. As a result, the following milestones were achieved with the operation of the new air-conditioning units:

1. 26.56% reduction in the building’s actual average power consumption from 3,791.67 kW in year 2012 to 2,784.54 kW in year 2018. This has translated to an average savings of Php 4,717,441.13 per month.
2. 100% emergency power supply of the building during power interruption.

Prepared by: Roy C. Tumacder
Position: Chief Engineer

null
IWS

International Wiring Systems (PHILS.) Corp.

Our 3 Plant which runs 24/7 is now kept at the right temperature and relative humidity all the time. Hi-Cool continues to maintain our system professionally and we look forward to our continued partnership. 

Engr. Leslie  T. Baun
Assistant Senior Manager
Administration, Safety & Energy Management

null
Bayleaf Hotel

The Bayleaf Hotel – HVAC Design & Savings

At Bayleaf, we always strive to reduce operating cost while at the same time adhere to an excellent service standard to delight our guest. With Hi-cool’s innovation (installation of heat recovery system) We enjoyed the unexpected but welcome benefit-free hot water used in our hotel’s guest showers. Not having to use industrial water heaters decrease our load translating to a lower demand charge from Meralco and lower power consumption. The Hitachi water-cooled screw-type packaged air-conditioner amd the water-cooled screw chiller from Japan are exceptionally reliable, durable and cost efficient.

Ed F. Vitug
General Manager,The Bayleaf Hotels